|
4566 Crystal Clear Dr,
Hilliard, OH 43026·614-402-1264·jgsg@columbus.rr.com
|
|
Jeffrey M Gregory
|
Objective
|
|
To
utilize my computer drafting and surveying experience to obtain a position
that will allow me to advance my career as I continue my education in
engineering.
|
Experience
|
|
March
2015 – Current
|
Los Alamos Technical Associates, Inc
|
Westerville, OH
|
Drafter/Designer
Worked on the
design and specifications for the following projects:
§ Paducah Nuclear Power Plant Ion Exchange System
renovation
§ Mansfield Water Line Design
§ Goodyear Airport Fiber Optic Expansion
§ Motor Wheel Disposal Site Ground water Remediation
Report
§ Continental Tire Ground Water Remediation
|
|
|
Aug –
Sept 2014
|
HLG Engineering
|
Dublin, OH
|
CADD Drafter
§ Contract position
§ Create and review telecommunication layout drawings
|
|
|
2013
|
American Structurepoint
|
Columbus, OH
|
Party Chief
§ Lead Crew of two using latest GPS and robotic
Trimble S6 total Station.
§ Data collection using Trimble TSC3 Controller.
§ Projects worked on include Dublin Rd/315 Roundabout
& Mentor Great Lakes Mall Expansion Topo for Dicks Sporting Goods
|
|
|
2006-2012
|
Campbell & Associates
|
Columbus, OH
|
Field
Technician/Party Chief
§ Opened the company’s satellite office in Columbus.
§ Mortgage location and boundary surveys completed on
a daily basis.
§ Performed ALTA and Topographic Surveys for Site
improvements as required.
§ Covered Southern Ohio (required daily travel)
§ Monitored, maintained & updated field work daily
to insure accurate reporting of work completed.
§ Downloaded and imported field books utilizing civil
3D software. Imported field books to create base maps for boundary
and topographic projects.
|
Education
|
|
2011 -
Present
|
Columbus State Community College
|
Columbus, OH
|
Associate in
Engineering
§ Studying Engineering
§ Focusing on become a Professional Engineer
§ OSHA 40 hour HAZWOPER Class
§ GIS Coursework completed
|
Certifications, Programs and Software
|
|
§
Auto CADD 2000
§ Auto CADD Civil 3D
§ MicroStation V8i
§ ArcGIS
§ SketchUp 2013
§ Layout 2013
§ Microsoft Excel 2010
§ Microsoft Powerpoint 2010
§ Microsoft Word 2010
§ Basics of Raster Data (for ArcGIS 10) –
Certification
§ Displaying Raster Data Using ArcGIS – Certification
§ Getting Started with GIS (for ArcGIS 10) –
Certification
§ Processing Raster Data Using ArcGIS 10 –
Certification
§ OSHA 40 Hour HAZWOPER - Certification
|
|
|
|
|